Replacement of Primary Super Heater for Power Boiler - Visy Pulp and Paper Tumut
Client
Visy/ DME Tumut
Timing
Oct 2019
Safety
Nil LTI
SCOPE OF WORK
- Replacement of Power Boiler Primary Super Heater upper bank including replacement of the Collection Steam Header and installation of new vent line.
- The removal and replacement of 55 Panels in total.
- The removal and reinstallation of boiler tube wall for access.
- The installation and welding of wall membrane 110 segments.
- All welds were 100% NDT
- Existing Superheater outlet header, was to be replaced with a modified designed one. And an additional vent line to be installed on the Header.
- All works were completed in 10 working days, which resulted in the plant being handed back ahead of schedule.
- Scope of works, including but not limited to, provision of NDT, materials, welder’s qualifications and procedures, weld locations